We are almost done. Well, that's what I said last post. I had to go on a short jaunt overseas, and was hoping to arrive home to a finished house. But it was not to be. They did make a lot of progress, including: putting the final coat on the hardwood and sealing the stone floors, which are now finally visible; installing the outside deck railings which turned out very nice indeed; finishing installing most of the recessed lights; and other minor little details like the doorbell and door chime.

The big remaining thing is the inside stair railing. They had installed the railing upstairs, but the bottom of the railing sticks out too far into the stairway, which looked dorky and posed a hazard. It turned out that this was the original design, but it had been modified back in July. The architect sent the change over to the fabrication place, but they claim to have never received it. Although they have taken the railing back to the shop to fix it, there is a big question as to who will pay (answer: not us). The railing should be fixed soon, and then they'll be back to install in a week or two. So we'll final the project in October.

Tomorrow the cleaners come, and hopefully the electricians. Then Friday the alarm folks come to complete their installation. And then we wait for the railing guys to come and we can final! There are still a few odds and ends that will need to be done like finishing the breakfast nook bench upholstery and installing the few missing odds/ends for our cabinets, but once we get the final inspection, we can move back into the rest of the house!

No comments: